The resort originally relied solely on diesel generators for power supply.Due to rising fuel costs, transportation challenges, and pollution concerns, the client sought to integrate a solar power system to fully utilize solar energy and achieve 100% replacement of the local diesel generator sets.
Project Name:Belize System
Year:2021
PV Capacity:300kWp
Energy Storage Capacity:500kW/540kWh